Overnight closures and 24-hour contraflow on A78 at Ayrshire

Drivers needs to be ready for main roadworks starting on Friday, April 1.

Important upkeep is anticipated to start on the A78 from Manson Street overbridge to the Warrix Interchange.

The £572,000 mission, headed up by Amey on behalf of Transport Scotland, is anticipated to run till Monday, April 11.

The work on southbound A78 will probably be accomplished utilizing each in a single day closures and steady contraflow detailed beneath.

Subsequent weekend, an in a single day closure of the southbound A78 is anticipated between Friday, April 1, till 6am Saturday, April 2.

A 24-hour contraflow will probably be in operation from 6am on Saturday, April 2 till 8pm on Sunday, April 10.

If all goes in keeping with plan, the final in a single day closure will happen on Sunday, April 10 at 8pm till Monday, April 11 at 6am to dismantle contraflow operation.

Put together for a diversion route throughout these occasions from Eglinton Interchange to the Newhouse Interchange through Lengthy Drive

Entry for emergency service automobiles will probably be maintained all through these works.

Do not miss the most recent Ayrshire headlines –signal as much as our free day by day e-newsletter right here

Post a Comment

Previous Post Next Post